Install checklists have moved to TinyCRM. Open the deal in the Sales Pipeline and use 🔧 Install checklist — it fills in from the deal's quote, saves in the deal's folder (with a PDF for the installers), and can be reopened and edited.
Go to TinyCRM →
This page still works for now, but checklists saved here aren't connected to a deal.
Machinery Delivery / Installation Checklist
Delivery and Installation
Dimensions
WLH
WDH
WLH
WH
WH
Washer
Electric
Disconnect
Water Lines
Drain Water Path
Spacing
Dryer
Electric
Disconnect
Make-Up Air
WH
Dryer Enclosure
Gas
Other Needs
Spacing
Equipment to Be Installed
Qty
Manufacturer
Model Number
Voltage
Installation Issues to Consider
1
2
3
4
5
6
Other Installation Notes
1
2
3
4
5
Known Conditions or Problems While in Operation
1
2
3
4
5
Existing Equipment — To Be Completed by Salesperson (If Bringing Machine into Warehouse)
#
Manufacturer
Model Number
Serial or REG Number
Voltage
WH or Scrap
1
2
3
Site Photos
Photos are compressed and saved inside this checklist. Click a photo to enlarge.